Update of development of Goducate Training Center in Iloilo, Philippines

 A worker clears the bottom of the canal to allow water from the pond to flow into the ricefield.
A worker clears the bottom of the canal to allow water from the pond to flow into the ricefield.
 A payloader widens the entrance to the camp.
A payloader widens the entrance to the camp.
 One-third portion of the water impoundment.  There has been no observed surface run-off                yet .  The water appears to have accumulated from the underground spring.
One-third portion of the water impoundment. There has been no observed surface run-off yet . The water appears to have accumulated from the underground spring.
A canal was made to drain water from the pond.  However, soil along the canal would                 collapse at certain sections so the flow of water is impeded. To solve this problem, 3-ft                  diameter concrete culverts will have to placed into the canal and covered with gravel                 and soil.
A canal was made to drain water from the pond. However, soil along the canal would collapse at certain sections so the flow of water is impeded. To solve this problem, 3-ft diameter concrete culverts will have to placed into the canal and covered with gravel and soil.